Step 2: Trim the pentagon down to 145-150mm diameter, the RED marks the cut areas
Step 3: Install the longer wheel studs
Step 4: Repack the bearing/hub with grease
Step 5: Install caliper bracket
Step 6: Slip on the correct rotor, the vanes are towards the rear of the vehicle at the top
Step 7: Install loaded caliper over the rotor, bleeders must face up
Step 8: Install appropriate "z32 conversion" brake lines, then bleed everything
Torque values:
10-12 ft-lbs for rotor bolts
55-65 ft-lbs for caliper bracket
65-85 ft-lbs for caliperStatistics: Posted by support — Sat Feb 01, 2014 8:58 pm
]]>